Marine Completed Projects

Maharashtra Maritime Board

Quantity Dredged : 79,009 Cum
Duration of the Project : May 2025
Location of the Project : Mandwa, Mumbai
Project Detailes: Maintenance Dredging at Navigation Channel of Mandwa. 2025-26

Western Dredging

Quantity Dredged : 51,838 Cum
Duration of the Project : June 2023 to July 2024
Location of the Project : Mandapam, Tamilnadu
Project Detailes: Provision Of Dredging/ Deepening of Approach Channel At North Mandapam For Coast Guard Jetty

Maharashtra Maritime Board

Quantity Dredged : 69,614 Cum
Duration of the Project : May 2024
Location of the Project : Mandwa, Mumbai
Project Detailes: Annual Maintenance Dredging at Navigation Channel of Mandwa. 2023-24

Dredging Corporation of India (Rock Dredging)

Quantity Dredged : 6355.20 CUM (Rock Dredging)
Duration of the Project : April to May 2024
Location of the Project : Coastal Berth, Jawaharlal Nehru Port Authority, Maharastra
Project Detailes: Removal of pinnacles / high spots (Rock Dredging) at Coastal Berth at JNPA and discharge of dredged materials by deploying suitable equipment

HPCL Limited

Quantity Dredged : 1,18,451 CUM
Duration of the Project : Feb to Nov 2023
Location of the Project : HPCL SWPH Jetty
Project Detailes: Main Dredging Job at salt water pump house at HPCL refinery

ITD Cementation India Limited (Now Known as Cemindia Projects Limited)

Quantity Dredged : 95,434 Cum
Duration of the Project : April 2023 to May 2023
Location of the Project : Liquid Cargo Jetty, Jawaharlal Nehru Port Authority, Maharastra
Project Detailes: Dredging of Berth Pocket upto (-)15.5 mCD from existing bed level including Disposal At JNPA Designated Area

Western Dredging

Quantity Dredged : 1,06,390 Cum
Duration of the Project : Feb to June 2023
Location of the Project : Sal River, Goa
Project Detailes : Desilting of River Sal Phase II from Ambelim towards downstream upto the mouth river Sal in 3rd Phase within an area of 6.0 Kilometers in length 12.0 meters wide and 3.0 meters depth to facilitate from movement of vessels.

Larsen And Toubro Limited

Quantity Dredged : 2,01,688 CUM
Duration of the Project : Oct 21 to April 23
Location of the Project : Breakwater at Dabhol,Ratnagiri, Maharashtra
Project Detailes: Dredging Work & Disposal of Dredged Material. Breakwater at Dabhol

Larsen And Toubro Limited

Quantity Dredged : 1,93,378 CUM
Duration of the Project : Sept 20 To May 21
Location of the Project : LE200137-Breakwater at Dabhol AT& Post RGPPL, Anjanwel, Tal-Guhagar, Ratnagiri-400001
Project Detailes: Dredging Work & Disposal of Dredged Material. Breakwater at Dabhol

Mercator Ltd.

Quantity Dredged : 2,02,135 Cum
Duration of the Project : Dec 18 to May 19
Location of the Project : Chicalim, Goa
Project Detailes : Maintenance Dredging at Naval Area of Goa at Chicalim NMPT