Ratlam Division, Western Railway
Nimach-Ratlam Doubling work : Composite tender for Execution of various works in Nimach (Km 241.54) - Dalauda (Km 305.15) section for doubling of Railway Line involving (I) Engineering works in yards and (ii) Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of work as mentioned in the tender document
Chennai Division, Southern Railway
Modification/Augmentation of existing OHE to enhance Reliability in MAS-GDR Section of Chennai Division
Dhanbad Division, East Central Railway
Design, Supply, Erection, Testing and Commissioning 25 KV, 50 Hz Single Phase Conventional Type Overhead Equipment (OHE), Sub-Sectioning and Paralleling Post (SSP) & associated Modifications, Associated General Electrical Work from take-off Point of Mahdeiya (MHDA) Railway Station to Gorbi Block-B of NCL, Singrauli under Dhanbad Division of East Central Railway in Madhya Pradesh”.
Pune Division, Central Railway
Design, supply, erection, testing & commissioning of 25 KV AC OHE including OHE modification work and removal work & removal of infringements etc. for 80 Kms (TKM) in connection with Doubling of Daund-Manmad Section.
Chennai Division, Southern Railway
Design, Supply, Erection, Testing and Commissioning of Traction Over Head Equipment on the proposed 4th line between Chennai Egmore and Chennai Fort stations including modification to the existing OHE in connection with the quadrupling of tracks between Chennai Egmore and Chennai Beach stations in Chennai division of Southern Railway
Ahmedabad Division, Western Railway
“Design, Supply, Erection, Testing and Commissioning of 25 kv, 50 Hz Single Phase Conventional type High Rise overhead equipment(OHE), Sub-Sectioning and Paralleling Post (SSP) & associated modifications, Associated General electrical work for Railway lines of KPRK Yard inside and outside Cargo Jetty area and GIM-TUNA Section of DBKT of Deendayal Port Authority in Ahmedabad Division of Western Railway in Gujarat”.
Mumbai Division Western Railway
TRD work in connection with provision of new coaching terminal at Jogeshwari.
Jhansi Division, North Central Railway
Design, Supply, Erection, Testing and Commissioning of 25 KV, AC, 50 HZ., OHE in Connection with Electrification of new Line being constructed for Doubling from Jhansi to Barwasagar section (25.5 Km.) in North Central Railway of Jhansi Division
Nagpur Division, Central Railway
Design, Supply, Erection, Testing and Commissioning 25KV, 50Hz Single Phase Conventional Type Overhead Equipment (OHE), Sub-Sectioning and Paralleling Post (SSP) & Associated Modifications, Associated General Electrical Work at New Makardhokra Station in connection with Prop. Railway Coal Loading Siding for Dinesh OCM Makardhokra-III on BTBR-URR Section Under Nagpur Division of Central Railway”
Lucknow division, Northern Railway
Design, Supply, erection, testing and commissioning of 50 Hz, Single Phase 25 KV AC OHE including modification of existing OHE in connection with doubling of Jaunpur- Zafrabad section and additional work of doubling of Jaunpur- Akbarpur section of Lucknow division Northern Railway
Mumbai Division, Central Railway.
Design, supply, erection, testing, & commissioning of 25KV AC OHE in connection with 'Panvel - Kalamboli Coaching Terminus, Phase - I, Stage - I' in Mumbai Division of Central Railway.
Jaipur Division. North Western Railway
Design, Supply, erection, testing and commissioning of (2 x 25 KV) AC HIGHRISE OHE & associated modification works in connection of Kathuwas - Narnaul doubling work of Jaipur Division of NWR
Pune Division, Central Railway
Design, supply, erection, testing & commissioning of 25 KV AC OHE for balance work of DD MMR doubling section including Akolner-Ahmednagar-Nimblak and Sarola-Ranjangaon Raod-Visapur, Modification of Major yards including OHE modification work & removal of infringements etc. in connection with Doubling of Daund manamad Section.
Pune Division, Central Railway
Design, supply, erection, testing & commissioning of 2x 25 KV AC OHE in BEED-PARLI SECTION (112 TKM) in connection with ANG Beed Parli New line project of Central Railway
Nagpur Division, Central Railway
Design, Supply, Erection, Testing and Commissioning of 25 kv, 50 Hz Single phase Retractable Rigid Catenary System (RRCS), Rigid Over Head Conductor System (ROCS) connecting Conventional Regulated existing OHE at either end of Silo for single silo with double track having one chute on each track including Annual Maintenance Contract (AMC) of 3 years for Rapid Loading System (RLS) Coal Loading Siding of WCL for Dinesh OCM Makardhokra-III on BTBR-URR Section under Nagpur Division of Central Railway in Maharashtra”.
Ajmer Division, North Western Railway
Design, Supply, Erection, Testing and Commissioning of Railway Electrification work of 2x25KV OHE system in ABU ROAD TARANGA HILL Section (0-61Km) of Ajmer Division, NWR in connection with New Line work
Varanasi Division, North Eastern Railway
Detailed Design, Engineering, Supply, Installation, testing and commissioning of 25 KV FOCS, ROCS (ROCS works to be mandatorily executed through OEM) and associasted works (08 TKM) on Ganga Bridge 111between Jhusi – Prayagraj Rambagh Section in connection to MUV-ALD Doubling project of Varanasi Division of North Eastern Railway in Uttar Pradesh, India
Pune Division, Central Railway
Leftover work of Daund-Manmad Doubling. Design Supply Erection Testing and Commissioning of OHE.
Mumbai Division. Central Railway.
Design, supply of materials, removal of infringements,modification, erection, testing, & commissioning of 25KV ACOHE in connection with construction of Double Chord Linebetween Nilaje & Kopar in Mumbai Division of Central Railway.
Solapur Division, Central Railway
Design, Supply, Erection, Testing & Commissioning of 25KV ACOHE 37 RKM , PSI work (Provision of 3 Nos SP/SSP) in Baramati-Phalatan section in connection with Lonand-Baramati Via Phaltan New line project of Central Railway.
Mumbai Division. Central Railway.
Design, Supply, Erection, Testing and Commissioningof 25KV AC OHE in connection with removal of infringment in Kalyan Yard (Kalyan Segregation of Long Distance and Suburban Traffic and Unification of Goods Yard) Phase II in Mumbai Division of Central Railway
Waltair Division. East Coast Railway
Design, Supply, Erection, Testing and Commissioning of 50 Hz, SinglePhase 1 X 25KV AC OHE for 62.03 TKM (Doubling between sectionsOEC- SCMN, BDVR-SLPM-TXD & BGHU-KVLS, ELS/WAT yard work& 3rd & 4th line between VDPT-Gt.Jn with Tie line and Design, Supply,Erection, Testing and Commissioning of 50 Hz, Single Phase 2x25KV ACOHE for 55.54 TKM (3rd & 4th line between VSKP-GPT, DVD- SCMN,GPT-SCMN) (Including yard modification works during Pre-NI/ & NI)along with associated PSI works of 01 No. 132/25 KV TSS Augmentation,05 nos. 1x25KV SSP (new) & 02 Nos. 1x25 KV SP's (new) in Waltair Division of East Coast Railway
Pune Division, Central Railway
Design, Supply, Erection, Testing & Commissioning of 25KV AC OHE in connection with
Provision of 5 stabling lines along with necessary facilities at Sainagar Shirdi.